POINT ORLANDO RESORT HOTEL | ORLANDO, FL
Project Details
Year
2024
Client
Private
SIZE
2 Buildings, 340 Units
- Removal of deteriorated concrete due to rebar steel corrosion caused a failing waterproof system at walkways.
- Spot repairs to address the issues with the failing stucco. These repairs are essential to maintain the structural integrity and aesthetic appeal of the building.
- Installation of 1500 waterproof traffic coating system at all elevated exterior walkways and stairs.