- Full Roof replacement with extended roof trusses
- Demolition and replacement of all stucco over second-floor exterior framed walls
- Repair all wood frame dry rot on the second floor including structural framing repairs
- Installation of new WRB (Weather Resistant Barrier) concealed barrier components
- Installation of new MI windows and integration with the new WRB system
- Properly integrate all WRB components with windows, roof components, and other penetrations
- New gutter installation in rear areas and at modified roof trusses
- Application of Florida Paint quality acrylic paint system to all buildings