NONA PRESERVE

  • Full Roof replacement with extended roof trusses
  • Demolition and replacement of all stucco over second-floor exterior framed walls
  • Repair all wood frame dry rot on the second floor including structural framing repairs
  • Installation of new WRB (Weather Resistant Barrier) concealed barrier components
  • Installation of new MI windows and integration with the new WRB system
  • Properly integrate all WRB components with windows, roof components, and other penetrations
  • New gutter installation in rear areas and at modified roof trusses
  • Application of Florida Paint quality acrylic paint system to all buildings

HARBOR CLUB CONDOMINIUMS

  • Extensive wood framing repairs, including replacement of damaged members within the truss floor system across 16 buildings
  • Interior drywall repairs within designated work areas
  • Replaced failing windows identified by the engineer with Hurricane-rated impact windows
  • Repaired and replaced interior gypsum board in affected areas
  • Installation of sheathing, and water-resistant barriers where required
  • Installation of new Hardie lap siding and Hardie Panel siding and restored exterior stucco finishes to match existing conditions
  • Sealed all repaired areas
  • Identified and reported any unforeseen structural or material damage to the Engineer of Record for further direction
  • Maintained compliance with all project specifications and construction standards

SUMMERGATE CONDOMINIUMS

  • Demolished and removed concrete, metal decking, and perimeter steel channel frame on staircases
  • Replaced landing metal deck, coordinated welding requirements and mechanical connections, ensuring levelness before concrete pour
  • Replaced and poured concrete at a slope, installing sealant with backer rods
  • Replaced stairway ceiling steel sub-frame, drywall, and paint with a quality acrylic painting system

MAGNOLIA PARK QUAD

  • Demolition and removal of all stucco over second-floor exterior framed walls
  • Repair all wood frame dry rot on the second floor
  • Installation of new WRB (Weather Resistant Barrier) concealed barrier components
  • Properly integrate all WRB components with windows, roof components, and other penetrations
  • Installation of new fiber cement siding with James Hardie Lap Siding
  • All windows flashed in place and integrated with new WRB components
  • Application of a Florida Paint quality acrylic paint system to all buildings
  • New hurricane shutter bolts installed
  • Replaced selectively failing lower back & front roofs, properly integrating with new WRB at roof to wall transitions

MAGNOLIA PARK WEST

  • Demolition and removal of all stucco over second-floor exterior framed walls
  • Repaired all wood frame dry rot on the second floor
  • Installation of new WRB (Weather Resistant Barrier) concealed barrier components
  • Properly integrate all WRB components with windows, roof components, and other penetrations
  • Installation of new fiber cement siding with James Hardie Lap Siding
  • All windows were flashed in place and integrated with new WRB components
  • Application of a Florida Paint quality acrylic paint system to all buildings
  • New hurricane shutter bolts installed

MAGNOLIA PARK NE

  • Re-sealing all windows, full community re-paint, and re-sealing all roof diverters
  • Repaint all buildings with a high-quality acrylic paint system
  • Applied sealants to all windows and diverters, including the addition of new diverters to direct water and protect against future issues

SUMMER KEY CONDOMINIUMS

  • Extensive wood-framing repairs, balcony re-sloping, and waterproofing
  • Cladding replacement by removing all stucco over three-story exterior framed walls
  • Installation of new concealed barrier components
  • Properly integrate all concealed barrier components with windows, roof components, and other penetrations
  • Installation of new fiber cement siding with James Hardie Prevail Lap Siding
  • Pull, reflash, and reset all existing window assemblies and sliding doors
  • Restoration of steel stair structures
  • Application of quality acrylic paint systems to all buildings

VERANO AT BARTRAM PARK

  • Cladding replacement by removing all stucco over second-floor exterior framed walls
  • Installation of new concealed barrier components
  • Properly integrate all concealed barrier components with windows, roof components, and other penetrations
  • Installation of new fiber cement siding with James Hardie Prevail Lap Siding
  • Removed, reflashed, and reset existing window assembly and installed new windows
  • Application of a quality acrylic paint system to all buildings

GEORGETOWN TOWNHOMES

  • Performed targeted framing, stucco, stone masonry veneer, and brick repairs
  • Reflash selected sliding glass doors.
  • Remove and reinstall selected aluminum windows
  • Add new shingle roofs and TPO flat roofs
  • Repaint the entire community

MITCHELL CREEK

  • I&E worked with HOA to achieve a cost-effective repair solution.
  • Replacement of all roof diverters
  • Installation of front gutters and downspouts
  • Sealed and painted the entire community with a quality acrylic exterior paint.

XANADU CONDOMINIUMS

  • Occupied restoration
  • Extensive conventionally reinforced concrete restoration
  • Concrete restoration of balconies and atrium walkways on a conventional reinforced concrete tower
  • Complete exterior repaint and balcony and walkway coating replacement
  • Balcony access via suspended scaffolding

TOWNS OF WESTYN BAY

  • Removal of 55,000 sq ft of stucco cladding and associated concealed barrier components
  • Repaired encountered wood damage as needed.
  • Removed and reinstalled windows onto a pan flashing.
  • Installed new concealed barrier components and 3-coat stucco cladding with knockdown texture.
  • Perform targeted repairs to the direct applied stucco on the ground level on all elevations buildings.
  • Sealed and painted with a quality acrylic exterior paint.
  • Re-roofed all 15 buildings of the community.
  • Removed and installed new pergolas from front of all buildings

FOUNTAIN PARKE

  • Selective repairs to privacy decks to address waterproofing and finish deficiencies

EMERSON PARK

  • Maintained a proactive line of communication with the homeowners association during occupied restoration
  • Replacement of deteriorated framing, wood sheathing, interior drywall, and some roofing repairs
  • Replacement of delaminated stucco and repairs to structural stucco cracks with a second floor-full exterior cladding replacement over wood framing
  • Full community repaint and replacement of damaged windows with waterproofing of all window flashing
  • Re-flashing of all penetrations, including roofing and doors

CARTER GLEN CONDOMINIUMS

  • Repairs to all associated damages from extensive water intrusion at windows
  • Installed new waterproofing systems to windows, balconies, and cladding to ensure longevity amongst buildings life

HERITAGE COMMONS

  • Cladding replacement by changing out failed stucco to fiber cement throughout the community 
  • Roof replacement with architectural shingles throughout
  • I&E assisted the Owner to select a more long term, cost-effective repair solution

VILLANOVA

  • Selected to correct & complete failing project previously managed by another contractor
  • Repairs included: deck, windows, sliding glass door assemblies, building envelope, and stucco replacement
  • Continue to perform long-term preventative maintenance for community

LAKE BUENA VISTA RESORT HOTEL

  • Removed deteriorated concrete due to rebar steel corrosion caused by no waterproof system at walkways
  • Failing stucco spot repairs to maintain the structural integrity and aesthetics
  • Installed Masterseal 1500 traffic coating system at all elevated exterior walkways and stairs
  • Repainted the building’s exterior, including doors and storefront
  • Removed and reinstalled handrailing from impacted areas

POINT ORLANDO RESORT HOTEL

  • Removal of deteriorated concrete due to rebar steel corrosion caused a failing waterproof system at walkways.
  • Spot repairs to address the issues with the failing stucco. These repairs are essential to maintain the structural integrity and aesthetic appeal of the building.
  • Installation of 1500 waterproof traffic coating system at all elevated exterior walkways and stairs.